Most Islington homeowners planning an extension, loft conversion or full refurbishment face the same early decision: hire one firm to design and build the lot, or appoint an architect first and then tender the work to builders. Neither route is automatically better. The right answer depends on your house, your budget and how much of the process you want to manage yourself.

Published 8 October 2026

How the two routes actually work

With design and build, one company produces the drawings, handles planning and building control, and then carries out the construction. You sign one contract and have one point of contact from the first sketch to the final snagging list.

With the traditional route, you appoint an architect who designs the scheme and secures consents. Their drawings then go out to two or three builders for competitive prices. You hold separate contracts with the architect and the builder, and usually with a structural engineer and a party wall surveyor as well. The architect can stay on to administer the building contract, or step back once work starts.

What each route tends to cost

Architects' fees for a full service on a residential project typically fall between 8% and 15% of the construction cost, with smaller and more complex jobs at the higher end. On a £150,000 rear extension and refurbishment, that could mean £12,000 to £22,000 before the engineer, surveys and party wall fees. Many homeowners trim this by paying for planning and building regulations drawings only.

Design and build firms usually charge a lower design fee, or fold it into the overall price, because they recover their margin on the build. The trade-off is that you lose the competitive tender, so it is harder to check the build price against the market. Ask for an itemised breakdown and compare it with at least one other quote.

In either case, what drives the final figure is mostly the building itself: the structural work, the specification, access for materials and skips on a tight terraced street, and how much of the existing house turns out to need attention once it is opened up.

Why Islington makes the choice matter more

A large share of the borough sits inside conservation areas, including Barnsbury, Canonbury and much of the land around Highbury Fields and Angel. Many Georgian and Victorian terraces are also listed. In these streets, permitted development rights are often restricted or removed, so work that would be routine elsewhere needs full planning permission and sometimes listed building consent.

That puts more weight on the design stage. Roof extensions, rear additions visible from the street, basement excavations and replacement windows all attract close scrutiny, and the council expects drawings that show a clear understanding of the building's character. A householder planning decision normally takes around eight weeks once the application is validated, and longer if revisions are requested.

Terraced housing also means party wall agreements with neighbours on one or both sides, which can add several weeks and a few thousand pounds in surveyors' fees. Whichever route you choose, check that someone is clearly responsible for managing this.

Which route suits which project

As a rough guide, these are the situations where each approach tends to work best.

Some homeowners take a middle path: an architect for the concept and the planning application, then a design and build contractor for the technical drawings and construction. This can work well where the planning case is the hard part and the build itself is conventional.

Questions to ask before you commit

Whoever you speak to, the same few questions will tell you a great deal about how the project is likely to run.

Questions

Asked and answered.

Is design and build cheaper than using an architect in Islington?

Often the design fees are lower, but the total cost is not always lower because you do not get competing build quotes. Compare an itemised design and build price against what an architect plus a tendered builder would be likely to cost for your project.

Do I need an architect for a house in an Islington conservation area?

There is no legal requirement to use one, but the council looks closely at design quality in conservation areas and on listed buildings. For sensitive sites, a designer with a track record of local approvals is well worth having, whether independent or part of a design and build firm.

How long does an extension project take from first drawings to completion?

Allow roughly two to three months for design and surveys, around eight weeks or more for planning, and time for party wall agreements before work starts. A typical single storey extension then takes three to four months on site, depending on size and specification.

Related

More from A&M Interiors.

Get in touch

Tell us about the job.

Call, WhatsApp or use the form. Send photos of the room if you can and we will come back with a free, no obligation quote.

Phone
WhatsApp
Quickest way to send photos for a quote
Email
Based in Stratford
Covering all London and around London
Fast response
We reply to every enquiry the same day