Rear, side return and wrap-around extensions built from the footings up: foundations dug and inspected, structure and steels in, roof on and weathertight, then the inside fitted out and joined into the rest of the house so it reads as one room rather than a bolted-on box. Kitchens, bifolds, rooflights and underfloor heating all handled by the same team.
Foundations dug to what the ground and the drains actually need, inspected by building control before anything goes on top, and the drainage rerouted properly rather than boxed around.
Steels sized by an engineer so you get the wide opening into the existing house, with the padstones, propping and sequence worked out before anybody knocks anything down.
The programme is built around getting the roof and the openings closed in early, so the house is not living with a plastic sheet for a wall any longer than it has to.
Floor levels, ceiling lines, skirtings and finishes carried through from the old rooms into the new, which is the difference between an extension and an extension you can see.
Single storey rear extensions often fall under permitted development, within depth, height and boundary limits that are tighter on a semi than a detached, and tighter again in a conservation area or on a flat. Double storey work and anything on the front nearly always needs a planning application. We work out which route your house is on at the survey and handle the application where one is needed, so you are not guessing.
If we are building up to or off a shared wall, or digging near it, the Party Wall Act applies and notices have to be served on the adjoining owner. It is a formality on most jobs but it is not optional, and getting it wrong is what turns a friendly neighbour into a dispute. We tell you what needs serving and when, and we work to keep access, noise and dust reasonable on their side of the fence too.
For a typical single storey rear extension, eight to fourteen weeks on site. The noisy, dusty part is the first fortnight, groundwork and breaking through, and the last part is finishing work that is largely inside the new space. Where the kitchen is going into the extension, we plan the sequence so you are not without a working kitchen for the whole programme, and we make sure there is a temporary arrangement before the old one comes out.
Yes, and that is most of the extensions we build. Because the same team does the structure, the electrics, the plumbing, the tiling, the flooring and the kitchen fit, the sockets end up where the appliances actually are and the floor runs through unbroken. It also means one price for the whole thing instead of a kitchen company arriving to find the space is not ready.
Yes. Plans and structural calculations go in, the inspections get booked at the right stages, foundations, drainage, steels, insulation and completion, and the certificate comes to you at the end. That certificate is the paperwork your solicitor will ask for when you sell, so it matters more than people expect.
One firm from the first sketch to the last coat of paint.
ServiceDormer, hip to gable, rooflight or a full mansard, worked out from what your roof will actually allow rather than what fits a brochure.
ServiceStrip out, first fix, fit and finish.
ServiceFull rip-out to a finished room: old suite and tiles off, pipework and wiring reworked, walls squared and boarded, tanking where it matters, then tiled, fitted and sealed.
ServiceA downstairs WC under the stairs, an en-suite carved out of a bedroom, a shower room in the loft.
ServiceStud partitions, new openings and closed-up doorways: turning one big room into two, splitting a through lounge, forming a hallway, boxing in a utility or opening a wall up with a beam over it.
ServiceThe wiring and pipework side of a refurbishment, handled by our own team instead of booked in around somebody else's diary.
ServiceBoarding, skimming, patching and rendering.
ServiceWalls and floors, large format porcelain, metro, mosaic and natural stone.
ServiceEngineered wood, laminate, vinyl plank, tiles and carpet made ready.
ServiceFilling, sanding, caulking and cutting in, then two coats properly laid on.
Call, WhatsApp or use the form. Send photos of the room if you can and we will come back with a free, no obligation quote.