Engineered wood, laminate, vinyl plank, tiles and carpet made ready. The work that decides how a floor looks and how long it lasts happens before the first board goes down: subfloors levelled, boards screwed off, moisture and underfloor heating allowed for, and expansion gaps and thresholds planned so nothing lifts, gaps or ticks underfoot.
Chipboard and timber screwed off and re-fixed, self-levelling compound where the concrete needs it, squeaks and movement dealt with before anything covers them.
Timber and engineered boards left to acclimatise in the room, then laid with the expansion gaps the manufacturer asks for, so a hot summer does not lift the middle of the floor.
Loops laid and screeded or overlay systems boarded out, with a floor covering chosen for the heat output rather than one that insulates the system you just paid for.
Doorway bars, scotia or beading, and the transition between two different floors planned so the join looks deliberate instead of improvised.
Always, because it decides everything else. On concrete that means self-levelling compound where the fall or the dips are outside tolerance. On timber it means screwing the boards back down, replacing anything soft and often overboarding with ply or hardboard. Laying a floor over an uneven subfloor gives you a floor that flexes, clicks and eventually opens at the joints, no matter what you paid for the boards.
Vinyl plank and good laminate are the pragmatic answer, they handle water, dogs and school shoes and they are easy to replace in a few years. Engineered wood is the better looking and better feeling floor and it can be sanded back once or twice, which laminate cannot. Solid timber in a kitchen or bathroom is asking for trouble. We will tell you what we would put in our own house rather than what has the biggest margin.
Yes, with the right build-up. Engineered wood and vinyl plank both work over underfloor heating, solid timber generally does not, and thick underlay or carpet wastes the heat you are paying for. The system gets commissioned and brought up to temperature gradually before and after laying, which the manufacturers all specify and plenty of people skip.
Yes, lift and disposal are part of the price. Old carpet, tiles and adhesive residue all come up and go, and the subfloor is checked once it is exposed. Sometimes lifting a floor is what reveals a leak, rot or a subfloor that needs work, and if it does, you get told what we have found and what it costs before we carry on.
Often, if the existing floor is a current product or you have spares. Where an exact match is not available, the better answer is usually a deliberate transition at a doorway rather than a slightly-wrong batch running into the old floor, which is the thing everybody notices. We will show you both options in the room before you decide.
One firm from the first sketch to the last coat of paint.
ServiceDormer, hip to gable, rooflight or a full mansard, worked out from what your roof will actually allow rather than what fits a brochure.
ServiceRear, side return and wrap-around extensions built from the footings up: foundations dug and inspected, structure and steels in, roof on and weathertight, then the inside fitted out and joined into the rest of the house so it reads as one room rather than a bolted-on box.
ServiceStrip out, first fix, fit and finish.
ServiceFull rip-out to a finished room: old suite and tiles off, pipework and wiring reworked, walls squared and boarded, tanking where it matters, then tiled, fitted and sealed.
ServiceA downstairs WC under the stairs, an en-suite carved out of a bedroom, a shower room in the loft.
ServiceStud partitions, new openings and closed-up doorways: turning one big room into two, splitting a through lounge, forming a hallway, boxing in a utility or opening a wall up with a beam over it.
ServiceThe wiring and pipework side of a refurbishment, handled by our own team instead of booked in around somebody else's diary.
ServiceBoarding, skimming, patching and rendering.
ServiceWalls and floors, large format porcelain, metro, mosaic and natural stone.
ServiceFilling, sanding, caulking and cutting in, then two coats properly laid on.
Call, WhatsApp or use the form. Send photos of the room if you can and we will come back with a free, no obligation quote.