Walls and floors, large format porcelain, metro, mosaic and natural stone. Substrates checked and levelled, wet areas tanked, then everything set out from the centre lines and the fixtures so the cuts land where nobody looks. Levelling clips on large format, grout and silicone lines dead straight, and the job left cleaned off rather than hazy.

Floors checked for movement and levelled, walls flattened, timber floors overboarded or uncoupled. Tiles crack because of what is under them far more often than because of the tiles.
Layout planned from the room's centre lines and the fixtures out, so cuts land in corners and behind doors and full tiles land where your eye goes first.
Levelling clips on large format porcelain, full bed coverage on floors and back buttering where the tile needs it, so nothing lips and nothing sounds hollow.
Grout colour chosen with you, joints consistent, movement joints where they belong and silicone run in one clean line rather than smeared and wiped.
Sometimes, and it is rarely the better job. It only works where the existing tiles are firmly bonded, flat and the extra thickness does not cause problems at doors, thresholds or around fixtures. Otherwise the old tiles come off and the wall or floor gets made good first. Tiling onto something you are not sure of means the new tiles fail with the old ones, and then you are paying twice.
A bathroom, floor and walls, is usually three to five days: prep and tanking, tiling, then grouting and sealing the next day so nothing is disturbed while the adhesive is still going off. A kitchen splashback is one or two. Large format porcelain and natural stone take longer because of the cutting and the setting out, which is time well spent rather than a delay.
Yes, on every shower and around every bath where the tiling goes. Tile adhesive and grout are not a waterproof layer, they are a decorative finish, so what keeps water out of the wall behind is the tanking membrane under them. It is a small part of the cost of a bathroom and it is the part that prevents a ceiling coming down downstairs in three years.
It is worth thinking about, because the grout is what you see. Matching the tile makes a floor read as one surface, contrasting makes a pattern out of metro tiles. Pale grout on a floor in a busy house will discolour, so mid greys stay looking right for far longer. We will show you the options against your tiles before we mix anything.
Yes. Matching a discontinued tile is the hard part, and if you have spares from the original job, dig them out. When a floor has several loose tiles in one area it usually means movement or a failed substrate under them, and replacing the tiles alone puts you back in the same position in a year. We will tell you which of the two you have got.
One firm from the first sketch to the last coat of paint.
ServiceDormer, hip to gable, rooflight or a full mansard, worked out from what your roof will actually allow rather than what fits a brochure.
ServiceRear, side return and wrap-around extensions built from the footings up: foundations dug and inspected, structure and steels in, roof on and weathertight, then the inside fitted out and joined into the rest of the house so it reads as one room rather than a bolted-on box.
ServiceStrip out, first fix, fit and finish.
ServiceFull rip-out to a finished room: old suite and tiles off, pipework and wiring reworked, walls squared and boarded, tanking where it matters, then tiled, fitted and sealed.
ServiceA downstairs WC under the stairs, an en-suite carved out of a bedroom, a shower room in the loft.
ServiceStud partitions, new openings and closed-up doorways: turning one big room into two, splitting a through lounge, forming a hallway, boxing in a utility or opening a wall up with a beam over it.
ServiceThe wiring and pipework side of a refurbishment, handled by our own team instead of booked in around somebody else's diary.
ServiceBoarding, skimming, patching and rendering.
ServiceEngineered wood, laminate, vinyl plank, tiles and carpet made ready.
ServiceFilling, sanding, caulking and cutting in, then two coats properly laid on.
Call, WhatsApp or use the form. Send photos of the room if you can and we will come back with a free, no obligation quote.